Standard textile terms: 30% T/T advance to start production, 70% against B/L copy after SGS inspection passes.
For first-time container orders, L/C at sight moves inspection risk to the bank — worth the fee above ~AED 100k.
Never release balances before pre-shipment inspection. Our rule: no SGS pass, no wire — written into every PI.
